M&E Design London

M&E Design Consultants London

Our team of experienced MEP engineers provides expert consultancy across all stages of design and construction, helping to optimise efficiency, ensure full regulatory compliance, and future-proof every project.

132a Webber Street, London, United Kingdom.+44 20300 40062
Embassy Gardens, Nine Elms
Embassy Gardens, Nine Elms

Our Role

Our Role as M&E Design Consultants in London

EDC is the trusted choice for M&E Design in London, working closely with developers, main contractors, M&E contractors, architects and planning consultants to deliver high-performance, sustainable building services solutions.

Our team of experienced MEP engineers provides expert consultancy across all stages of design and construction, helping to optimise efficiency, ensure full regulatory compliance, and future-proof every project.

  • Mechanical: heating, cooling and ventilation, including heat pump and heat network strategies.
  • Electrical: power distribution, lighting, fire alarm, security and EV charging infrastructure.
  • Public health: water services, drainage, rainwater, and sprinkler and riser interfaces.
  • Energy and sustainability: SAP and SBEM modelling, energy statements, overheating analysis and BREEAM.
  • Vertical transport: lift and vertical transportation design.
  • Coordination: MEP modelled and coordinated in BIM to ISO 19650, so clashes are resolved before site.
M&E Design Consultants London
London requirements

What London Asks of your Building Services

London asks more of building services than most UK planning authorities. These are the requirements that shape MEP design on London schemes, what each means for you, and what we deliver.

Building Safety Act 2022Applies to Buildings 18 m+ or 7+ storeys with at least two homes

Higher-risk buildings and BSR gateways

What it means for your scheme

Higher-risk buildings get building control approval from the Building Safety Regulator. Gateway 1 applies at planning through a fire statement. At Gateway 2, before construction starts, the full design, building services included, has to be submitted and approved. Gateway 3 reviews the as-built information before the building can be occupied.

Changes during construction go through formal change control, and the information is kept as a golden thread for the life of the building.

What EDC delivers

  • MEP design information packaged for Gateway 2 applications
  • Smoke control design, including CFD analysis for corridor and car park extract
  • Controlled change management during construction
  • Golden thread documentation through to Gateway 3
How we work

When to bring in your MEP engineer, and what you get at each stage

We work to the RIBA Plan of Work, the same stages as the rest of your design team. The earlier we are involved, the more cost and risk we can design out.

  1. RIBA Stage 0-1

    Strategic definition and brief

    Before design starts, we check what the site can support and what the scheme will need.

    • Utilities and capacity review
    • Plant space and riser allowances
    • Energy and carbon targets
  2. RIBA Stage 2

    Concept Design

    The big decisions: heat source, energy strategy and where plant goes. Getting them right now avoids redesign later.

    • Energy strategy options
    • Overheating risk review
    • Plant and riser layouts
  3. RIBA Stage 3Planning

    Spatial coordination

    A coordinated MEP design and the reports your planning application needs, usually submitted at the end of Stage 2 or 3.

    • Energy statement
    • TM59 overheating assessment
    • Whole life carbon inputs
  4. RIBA Stage 4Gateway 2

    Technical design

    Full technical design and specifications. For higher-risk buildings, the MEP information the Building Safety Regulator needs before work starts.

    • Technical design and specifications
    • ISO 19650 BIM model
    • Gateway 2 information
  5. RIBA Stage 5

    Construction

    We stay involved on site to protect the design intent, review contractor proposals and manage change.

    • Installation drawing packages
    • Site inspections
    • Change control
  6. RIBA Stage 6Gateway 3

    Handover

    Commissioning is witnessed and the as-built information assembled for handover and, for higher-risk buildings, Gateway 3.

    • Commissioning witnessing
    • O&M manual review
    • Golden thread information
  7. RIBA Stage 7Be Seen

    Use

    Energy performance in use is reported under the London Plan's Be Seen requirement, and we help close the gap between design and reality.

    • Be Seen reporting support
    • Seasonal commissioning
    • Performance review
Why EDC

Why London developers choose EDC

Progressive MEP design from engineers who stay involved, from early engagement through to handover.

  1. 01

    Designed right the first time

    We engage the wider design team early and integrate infrastructure into the MEP design from the start, backed by a QA process that monitors every project. Design once. Get it right. Deliver with confidence.

    First consultancy in Ireland and the UK to achieve Level 2 BIM accreditation, now ISO 19650

  2. 02

    Collaboration: One point of contact, 24-hour response

    Every client has a dedicated single point of contact who takes an active role in the project, so decisions don't stall. Senior leadership from Day 1.

    Guaranteed 24-hour response time

  3. 03

    Commercially aligned from day one

    We define performance requirements early and apply cost oversight throughout design development, preventing over-engineering and late-stage redesign.

    Cost and risk management is one of our core services

Selected London projects

View all projects
ProjectLocationClientValueEDC scope
Notting Hill Place
LondonMidgard City Ltd, part of the JRL Group£175 mMEP Design 4C and full installation drawing package
The Printworks & 807
Tottenham, LondoMcAleer & Rushe£50mMEP Design Energy & Sustainability BREEAM Consultancy
The Green Quarter
Southall, LondonSt. George (Part of Berkeley Group)Total Development: £2bMEP Design
Embassy Gardens
Nine Elms, LondonBallymore£200mMEP Design (Stage 2 - 6) Energy & Sustainability Services
The Habour Central
LondonGalliard Homes£220mMEP Design
Consort Place (The Aspen)
Canary Wharf, LondonJRL Ark M&E£470 millionMEP Design
Holborn Viaduct
LondonMcAleer & Rushe–MEP Design, Energy, BREEAM
The Ark, Canary Wharf
Canary Wharf, LondonO'Shea£50mMEP Design, Fire Engineering, BREEAM, eNERGY
M&E design in London

Questions developers ask us

Straight answers to what we're asked most about MEP design on London schemes.

As early as RIBA Stage 1 or 2. The heat source, plant space, riser routes and energy strategy shape the architecture, and they need settling before a planning application. Appointing late usually means redesign, lost floor area or a weaker planning submission.

Talk to an engineer

Tell us about your London scheme

Share a few details and a London engineer will come back to you. Every client gets a dedicated point of contact with a guaranteed 24-hour response.

  • Planning energy, carbon and overheating strategy
  • Building Safety Regulator gateway support
  • Full MEP design, from concept to handover
  • Alan TyrrellAlan TyrrellRegional Director - London